Yes, the final payment can be discussed in relation to inspection and successful machine testing, but YUANTIAN’s stated standard is 30% advance payment with the balance paid before shipment. The published terms do not specifically guarantee payment after customer inspection. Any inspection-based payment condition should therefore be confirmed and written into the sales contract before ordering the YT-CJ-4 Fabric Slitting Machine.
The payment terms and testing process address different stages of the purchase. The stated standard requires the balance before shipment, while the inspection system verifies the machine before dispatch. A contract may link the balance to an agreed inspection procedure, but the available business terms do not confirm that this arrangement is automatically available.
For international orders, Foshan Yuantian Mattress Machinery Co.,Ltd follows ISO 9001 and ISO 14001 management requirements. Its quality process includes incoming inspection of steel, electrical components, and transmission parts; three-level testing of key components; complete-machine testing; export-specific anti-corrosion and moisture-proof checks; and production traceability.
The YT-CJ-4 Fabric Slitting Machine is listed under the Mattress Quilting Series. Its specified cutting width is up to 2400 mm, strip width is at least 40 mm, cutting thickness is up to 50 mm, and total weight is approximately 900 kg. The power supply is 3-phase 380 V, 50 Hz, with customization available according to customer requirements.
For a payment condition tied to successful testing, the contract should identify the testing location, inspection scope, acceptance criteria, responsible parties, testing records, and the payment release point. These details should be agreed before production or shipment because the published standard only states that the balance is paid before shipment.
YUANTIAN has supplied mattress machinery to customers in multiple regions. A Brazilian customer cited high capacity, touchscreen parameter switching, and reduced operator skill requirements. A Vietnamese customer described cooperation that progressed from semi-automatic machinery to fully automatic and intelligent production lines.
| Item | Published information | Contract implication |
|---|---|---|
| Advance payment | 30% advance deposit | Payable before production under the stated standard |
| Final payment | Balance paid before shipment | Customer inspection linkage is not expressly stated |
| Machine testing | 24-hour no-load and load test for finished machines | Testing records can support an agreed acceptance process |
| Customer inspection | Not specified as a standard payment condition | Must be negotiated and documented |
| Alternative payment methods | Irrevocable sight L/C; negotiable D/P and D/A for long-term cooperative customers; Western Union and PayPal for small orders | Availability depends on order type and customer relationship |
| Product delivery | 50–60 days for the YT-CJ-4 Fabric Slitting Machine | Use the confirmed delivery schedule in the purchase contract |
Can the final payment be made after customer inspection?
The available terms do not state this as a standard arrangement. It may be negotiated, but the agreed inspection and payment conditions should appear in the contract.
What testing does the machine receive before shipment?
Each finished machine runs a 24-hour no-load and load test. The stated checks cover stability, precision, noise level, and safety. Export orders also receive anti-corrosion, moisture-proof, and shipping-adaptability checks.
What payment options are listed for international buyers?
The listed options are T/T with a 30% advance deposit and balance before shipment, irrevocable sight L/C for large-volume overseas orders, negotiable D/P and D/A for long-term cooperative customers, and Western Union or PayPal for small orders.
The published standard does not confirm final payment after inspection; it specifies a 30% advance deposit and balance before shipment. Buyers seeking payment release after successful machine testing should negotiate a written acceptance clause covering the 24-hour test, inspection method, test documentation, acceptance criteria, and release timing. YUANTIAN operates an integrated manufacturing and trading model, with a minimum order quantity of 1 for its business model and a stated company-level delivery time of 30 days, while the YT-CJ-4 product listing specifies 50–60 days. For detailed technical solutions or support, please reach out to us via yuantian@yuantian.com.
Foshan Yuantian Mattress Machinery Co.,Ltd, also known as YUANTIAN Mattress Machinery, was founded in 1982 in Foshan and specializes in the research, development, production, sales, and service of mattress machinery and spring mattresses. The company operates 150,000 square meters of production facilities and produces eight major series with 146 machinery specifications, launching 2–3 new products each year. Its products cover the Chinese domestic market and are exported to 110 countries and regions, with an export ratio of 60%. Its listed certifications include ISO 9001 for the research, development, production, and sales of bed machinery products, and ISO 9001 for environmental management activities related to mattress machinery.

Are there any eco-friendly alternatives to traditional mattress quilting series machines?
Are spare parts easily available if my Mattress Tape Egde Machine breaks down?
Are there any eco-friendly or high-speed alternatives to traditional mattress quilting series machines currently trending?
Is it possible to customize the sewing patterns and width on a mattress quilting series machine to match our brand's unique design?
How can I verify if a manufacturer of mattress tape edge machines has a real factory and reliable quality management systems?
INQUIRY